--- title: "Quick tips to maximize daily coverage" slug: "quick-tips-to-maximize-daily-coverage" updated: 2026-04-21T15:42:48Z published: 2026-04-21T15:42:48Z canonical: "knowledge.navvis.com/quick-tips-to-maximize-daily-coverage" --- > ## Documentation Index > Fetch the complete documentation index at: https://knowledge.navvis.com/llms.txt > Use this file to discover all available pages before exploring further. # Quick tips to maximize daily coverage ### **Before the visit:** - **Pre-clear access:** - Confirm site access, inductions, and escorts in advance. - Arrange for keys / access cards and ensure doors are unlocked or can be propped open where allowed. - **Plan scan segments and loop closures:** - Define logical segments (per floor, wing, or building). - Plan loop closure paths on a floor plan beforehand. - **Prepare control points:** - Decide in advance where a control point is needed and how it will be measured. - Install or mark control points before the scanning day if possible. ### **On the day:** - **Minimize starts and stops:** - Avoid unnecessary pauses while scanning. - Group short interruptions together where possible (e.g. housekeeping, quick checks) between scan segments. - **Standardize procedures:** - Use a checklist for each scan segment (control point captured, start/stop points, loop closure path, panorama strategy). - **Optimize panoramas:** - Take panoramas strategically, not at every step. - Consider [Continuous Pano Capture Mode](/v1/docs/triggering-the-cameras#continuous-pano-capture-mode) mode when the image quality of the panoramic image is not important. - **Use multiple devices smartly:** - Split areas cleanly between operators to avoid overlap. - Share a consistent control framework and naming convention. ### **After the visit:** - **Review performance data:** - Track realized m²/day (ft²/day) and m²/hour (ft²/hour) across projects. - Feed this back into your planning assumptions for future jobs. ## **Accuracy vs. speed trade‑off** - Higher speed is not always better if it compromises: - Loop closure quality - Coverage completeness (e.g. missing rooms or occluded areas) - Alignment to control / coordinate systems - For high‑accuracy or highly regulated projects, you may: - Accept lower m²/hour (ft²/hour) - Invest more time in control points, redundant passes, and quality validation. This should be explicit in your project planning and client communication.